Item
|
Assigned
|
Status |
Notes
|
Actuators
|
|
|
|
1
|
Get
and install radio E-stop. |
Nagle |
DONE |
Ordered
from Remtron. |
2
|
Build
Galil interface board |
T
Smith |
DONE |
Out
for board layout |
3
|
Hook
up and test tach and speedometer. |
Nagle |
DONE |
Waiting
for interface board |
4
|
Install
WLAN. |
Nagle |
DONE |
|
5
|
Add
retention on power connectors for computer and VORAD. |
|
|
|
6 |
Bench
test throttle unit |
Scheinman |
DONE |
|
7 |
Expand
glove compartment to fit controllers |
Scheinman |
DONE |
|
8
|
Install
Galil unit for throttle in vehicle. |
Nagle |
DONE |
|
9
|
Install
throttle actuator box. |
Scheinman |
DONE |
|
10
|
Rewire
steering encoder wiring for more ruggedness. |
Nagle |
DONE |
|
|
|
|
|
|
Sensors
|
|
|
|
1
|
Wire
up VORAD to computer box. |
Nagle |
DONE |
Works |
2
|
Get
INS working again. |
Okerson |
DONE |
Wiring
only, components in place |
3
|
GPS?
|
Okerson |
DONE |
Working,
but not integrated with driving |
|
|
|
|
|
Vehicle
|
|
|
|
1
|
Fix
main battery switch wiring. |
|
|
Miswired
- does not cut all power. |
2
|
Add
breaker for E-stop system |
Scheinman |
DONE |
Must
avoid shorting battery. |
3
|
Power
E-stop from battery, or battery and and generator via diode block
or relay. |
Sheridan |
DONE |
|
4
|
Radio
E-stop must kill engine. |
|
|
Defer
until computer controls engine. |
5
|
E-stop
buttons must kill generator. |
Nagle |
DONE |
All
red buttons now kill generator. |
6
|
Cut
under-hood lid to fit around actuator gear. |
|
|
Won't
fit around E-stop box |
7 |
Improve
grounding |
Nagle |
DONE |
Ground
everything to tie point near battery |
8
|
Install
back-bed cover latches. |
Nagle |
DONE |
|
|
|
|
|
|
Software
|
|
|
|
1
|
Add
meter support for tach and speedo. |
Schienman |
DONE |
Waiting
for interface board |
2
|
Add
throttle pedal support, inc. basic engine RPM control. |
Nagle |
DONE |
but
position, not RPM |
3
|
Add
actuator error monitoring. |
Nagle |
|
In
test, needs tuning |
4
|
Add
basic radar anti-collision support. |
Nagle |
|
In
test on vehicle in shop |
|
|
|
|
|
Testing
|
|
|
|
1
|
Engine
servo control testing, vehicle on blocks |
All |
DONE |
Have
run engine in neutral in R/C mode |
2
|
First
test in yard |
All |
DONE |
|